• Home
  • Our Mission
  • Contact Us
  • Subscribe
  • Buyer's Guide
  • Media guide
  • links
  • bsm
  • Stay in the know:
  • facebook
  • |
  • X
  • |
  • Linkedin
  • |
  • Previous Issues


  • JLG Opens Las Vegas Service Center with Sustainable Features

    Contributed by FSM Staff

    MCCONNELLSBURG, PA -- JLG Industries, Inc., an Oshkosh company and manufacturer of mobile elevating work platforms (MEWPs) and telehandlers, has opened a 30,000-square-foot Las Vegas Service Center to service equipment rentals and owned machines in the western U.S. 

    The center is complete with eight shop bays and two acres of storage space, the location allows JLG and its team of 10 technicians to provide maintenance on large fleets and build out its customer base.     

    In addition, the new facility, located on 4140 Frehner Road in North Las Vegas, has overhead crane capacity that will enable heavy-duty repair on large machines to be completed safely and efficiently. With three ten-ton and two five-ton cranes, JLG brings a much-needed repair capability to area clientele and is open Monday through Friday from 7:00 a.m. to 5:00 p.m. PST. 
    A building with a sign on it  Description automatically generated 

    “The new service center enables JLG to reach more western U.S. customers, and do so in a more sustainable manner,” says Ken Ferguson, JLG Senior Director of Operations.  “This service center—JLG’s fifth service center location and its only location west of Texas—will help keep JLG fleets at peak performance and round out service offerings from JLG and its Authorized Service Providers.”  

    Focus on Sustainable Features 
    With JLG’s commitment to sustainability, delivering innovative, energy-efficient solutions was a priority when building this new service center. Two of the center’s key features promote a greener approach to servicing equipment. 

    JLG implemented a first-of-its-kind exterior wash pad on site that recirculates and filters water to reduce waste and prevent chemicals from seeping into the sewage system. The water is collected within a floor basin to be treated and repurposed, and over time any waste that’s generated is separated and hauled away for disposal.   

    A large warehouse with yellow beams  Description automatically generated 

    Additionally, JLG operates the new facility with a Solar Power Lift Dock that utilizes sensors to adjust for height variations of equipment loaded into the center. JLG has incorporated this solar solution at other JLG Service locations as a more sustainable alternative to hydraulic or electrical lift docks.  

    “JLG provides simple, effective solutions that create a more efficient service center experience while helping the environment,” Ferguson added. “It’s our vision that the long-term impact of these energy solutions can help offset carbon emissions within the market.” 

    Advertisements

    FSM Buyers Guide
    Securis
    Carbis
    Elasco
    Pelsue
    Proline

     


    Safety Rail

     
    • © 2005-2023 Facility Safety Management - All Rights Reserved * 
    • |
    • Advertise